Wednesday, May 20, 2015

Oracle AIM Documentation

Oracle AIM Documentation

In Continuation to my previous post on Oracle Application Implementation Methodology Phases & Processes. In this post, provided the deliverable of Oracle AIM Processes.

Oracle AIM encompasses a project management methodology with documentation templates that support the life cycle of an implementation. The life cycle methodology and documentation template allows AIM to be a very useful tool for managing implementation projects successfully.

Oracle AIM Life Cycle:
Application Implementation Method is a proven approach for all the activities required to implement oracle applications. There are eleven processes of implementation.

1.     Business Process Architecture [BP]

This phase explains the Existing Business Practices, Catalog change practices, Leading practices & Future practices

BP010            Define Business and Process Strategy
BP020            Catalog and Analyze Potential Changes
BP030            Determine Data Gathering Requirements
BP040            Develop Current Process Model
BP050            Review Leading Practices
BP060            Develop High-Level Process Vision
BP070            Develop High-Level Process Design
BP080            Develop Future Process Model
BP090            Document Business Procedure

2. Business Requirement Definition [RD]

This phase explains about the initial baseline questionnaire and gathering of requirements.

RD010             Identify Current Financial and Operating Structure
RD020             Conduct Current Business Baseline
RD030             Establish Process and Mapping Summary
RD040             Gather Business Volumes and Metrics
RD050             Gather Business Requirements
RD060             Determine Audit and Control Requirements
RD070             Identify Business Availability Requirements
RD080             Identify Reporting and Information Access Requirements

3. Business Requirement Mapping [BR]

In this phase the requirements of business are matched with the standard functionality of the oracle applications.

BR010             Analyze High-Level Gaps
BR020             Prepare mapping environment
BR030             Map Business requirements
BR040             Map Business Data
BR050             Conduct Integration Fit Analysis
BR060             Create Information Model
BR070             Create Reporting Fit Analysis
BR080             Test Business Solutions
BR090             Confirm Integrated Business Solutions
BR100             Define Applications Setup
BR110             Define security Profiles

4. Application and Technical Architecture [TA]

This outlines the infrastructure requirements to implement oracle applications.

TA010             Define Architecture Requirements and Strategy
TA020             Identify Current Technical Architecture
TA030             Develop Preliminary Conceptual Architecture
TA040             Define Application Architecture
TA050             Define System Availability Strategy
TA060             Define Reporting and Information Access Strategy
TA070             Revise Conceptual Architecture
TA080             Define Application Security Architecture
TA090             Define Application and Database Server Architecture
TA100             Define and Propose Architecture Subsystems
TA110             Define System Capacity Plan
TA120             Define Platform and Network Architecture
TA130             Define Application Deployment Plan
TA140             Assess Performance Risks
TA150             Define System Management Procedures

5. Build and Module Design [MD]

This phase emphasizes the development of new functionality (customization) required by the client. It mainly details how to design the required forms, database and reports.

MD010           Define Application Extension Strategy
MD020           Define and estimate application extensions
MD030           Define design standards
MD040           Define Build Standards
MD050           Create Application extensions functional design
MD060           Design Database extensions
MD070           Create Application extensions technical design
MD080           Review functional and Technical designs
MD090           Prepare Development environment
MD100           Create Database extensions
MD110           Create Application extension modules
MD120           Create Installation routines

6. Data Conversion [CV]

Data Conversion is the process of converting or transferring the data from legacy system to oracle applications. Ex. Transferring customer records from the legacy to the Customer Master.

CV010             Define data conversion requirements and strategy
CV020             Define Conversion standards
CV030             Prepare conversion environment
CV040             Perform conversion data mapping
CV050             Define manual conversion procedures
CV060             Design conversion programs
CV070             Prepare conversion test plans
CV080             Develop conversion programs
CV090             Perform conversion unit tests
CV100             Perform conversion business objects
CV110             Perform conversion validation tests
CV120             Install conversion programs
CV130             Convert and verify data

7. Documentation [DO]

Documentation prepared per module that includes user guides and implementation manuals.

DO010            Define documentation requirements and strategy
DO020            Define Documentation standards and procedures
DO030            Prepare glossary
DO040            Prepare documentation environment
DO050            Produce documentation prototypes and templates
DO060            Publish user reference manual
DO070            Publish user guide
DO080            Publish technical reference manual
DO090            Publish system management guide

8. Business System Testing [TE]

A process of validating the setup’s and functionality by QA (Functional Consultant) to certify status.

TE010              Define testing requirements and strategy
TE020              Develop unit test script
TE030              Develop link test script
TE040              Develop system test script
TE050              Develop systems integration test script
TE060              Prepare testing environments
TE070              Perform unit test
TE080              Perform link test
TE090              Perform installation test
TE100              Prepare key users for testing
TE110              Perform system test
TE120              Perform systems integration test
TE130              Perform Acceptance test

9. Performance Testing [PT]

Performance testing is the evaluation of transactions saving time, transaction retrieval times, workflow background process, database performance, etc

PT010              Define Performance Testing Strategy
PT020              Identify Performance Test Scenarios
PT030              Identify Performance Test Transaction
PT040              Create Performance Test Scripts
PT050              Design Performance Test Transaction Programs
PT060              Design Performance Test Data
PT070              Design Test Database Load Programs
PT080              Create Performance Test Transaction Programs
PT090              Create Test Database Load Programs
PT100              Construct Performance Test Database
PT110              Prepare Performance Test Environment
PT120              Execute Performance Test

10. Adoption and Learning [AP]

This phase explains the removal of the legacy system and oracle application roll out enterprise wide.

AP010             Define Executive Project Strategy
AP020             Conduct Initial Project Team Orientation
AP030             Develop Project Team Learning Plan
AP040             Prepare Project Team Learning Environment
AP050             Conduct Project Team Learning Events
AP060             Develop Business Unit Managers’ Readiness Plan
AP070             Develop Project Readiness Roadmap
AP080             Develop and Execute Communication Campaign
AP090             Develop Managers’ Readiness Plan
AP100             Identify Business Process Impact on Organization
AP110             Align Human Performance Support Systems
AP120             Align Information Technology Groups
AP130             Conduct User Learning Needs Analysis
AP140             Develop User Learning Plan
AP150             Develop User Learning ware
AP160             Prepare User Learning Environment
AP170             Conduct User Learning Events
AP180             Conduct Effectiveness Assessment

11. Production Migration [PM]

The process of “decommissioning” of legacy system and the usage (adoption) of oracle application system.

PM010            Define Transition Strategy
PM020            Design Production Support Infrastructure
PM030            Develop Transition and Contingency Plan
PM040            Prepare Production Environment
PM050            Set Up Applications
PM060            Implement Production Support Infrastructure
PM070            Verify Production Readiness
PM080            Begin Production
PM090            Measure System Performance
PM100            Maintain System
PM110            Refine Production System
PM120            Decommission Former Systems
PM130            Propose Future Business Direction

PM140            Propose Future Technical Direction

1 comment: